Skip to content
Tool 02 / Sub Bid LevelerIn drafting

Sub Bid Leveler

In drafting

Four electrical bids, four different scopes, one afternoon to level them. Sub Bid Leveler lines up every sub proposal for a trade package side by side: inclusions, exclusions, qualifications, and what the low number is actually missing. The low number isn't always the low bid. This shows you which is which before you award.

Get it the day it ships.

One email when Sub Bid Leveler launches. No newsletter, no spam.